Name: Access Controlled Highway - North-South connection on west side of study area
Display Field: Alternative_Routes_DocName
Type: Feature Layer
Geometry Type: esriGeometryPolyline
Description:
Copyright Text:
Min. Scale: 0
Max. Scale: 0
Default Visibility: false
Max Record Count: 2000
Supported query Formats: JSON, geoJSON, PBF
Use Standardized Queries: True
Extent:
XMin: 2305351.73687745
YMin: 2197653.48291016
XMax: 2369976.34832764
YMax: 2253765.9426899
Spatial Reference: 102670 (2243)
Drawing Info:
{"renderer":{"type":"simple","symbol":{"type":"esriSLS","style":"esriSLSSolid","color":[140,140,140,255],"width":1}},"scaleSymbols":true,"transparency":0,"labelingInfo":[{"labelExpressionInfo":{"expression":"$feature.Alternative_Routes_Level","title":"Custom"},"labelPlacement":"esriServerLinePlacementCenterAlong","textLayout":"horizontal","deconflictionStrategy":"dynamicNeverRemove","allowOverrun":true,"repeatLabel":false,"lineConnection":"minimizeLabels","allowOverlapOfFeatureInterior":"avoid","stackLabel":true,"stackAlignment":"dynamic","removeDuplicates":"none","stackRowLength":24,"where":"Alternative_Routes_Level = 44","useCodedValues":true,"maxScale":0,"minScale":0,"name":"ALL","priority":-1,"symbol":{"type":"esriTS","color":[0,0,0,255],"backgroundColor":null,"borderLineColor":null,"borderLineSize":null,"verticalAlignment":"bottom","horizontalAlignment":"left","rightToLeft":false,"angle":0,"xoffset":0,"yoffset":0,"kerning":true,"haloColor":[255,255,255,255],"haloSize":1,"font":{"family":"Arial Black","size":8,"style":"normal","weight":"normal","decoration":"none"}}}]}
HasZ: true
HasM: false
Has Attachments: false
Has Geometry Properties: true
HTML Popup Type: esriServerHTMLPopupTypeAsHTMLText
Object ID Field: OBJECTID_1
Unique ID Field:
IsSystemMaintained : True
Global ID Field:
Type ID Field:
Fields:
- OBJECTID_1 (type: esriFieldTypeOID, alias: OBJECTID_1, SQL Type: sqlTypeOther, length: 0, nullable: false, editable: false)
- Alternative_Routes_Handle (type: esriFieldTypeString, alias: Handle, SQL Type: sqlTypeOther, length: 255, nullable: true, editable: true)
- Alternative_Routes_Level (type: esriFieldTypeInteger, alias: Level, SQL Type: sqlTypeOther, nullable: true, editable: true)
- c23349L20240412DraftLevel1Conce (type: esriFieldTypeString, alias: note, SQL Type: sqlTypeOther, length: 255, nullable: true, editable: true)
- Concept_Description (type: esriFieldTypeString, alias: Concept_Description, SQL Type: sqlTypeOther, length: 400, nullable: true, editable: true)
- Screen_Rationale (type: esriFieldTypeString, alias: Screen_Rationale, SQL Type: sqlTypeOther, length: 400, nullable: true, editable: true)
- PrelimScreeningResult (type: esriFieldTypeString, alias: PrelimScreeningResult, SQL Type: sqlTypeOther, length: 255, nullable: true, editable: true)
- Alternative_Routes_CadModel (type: esriFieldTypeString, alias: CadModel, SQL Type: sqlTypeOther, length: 255, nullable: true, editable: true)
- c23349L20240412DraftLevel1Con_1 (type: esriFieldTypeString, alias: Location, SQL Type: sqlTypeOther, length: 255, nullable: true, editable: true)
- c23349L20240412DraftLevel1Con_2 (type: esriFieldTypeString, alias: Concept, SQL Type: sqlTypeOther, length: 255, nullable: true, editable: true)
- Segment (type: esriFieldTypeString, alias: Segment, SQL Type: sqlTypeOther, length: 255, nullable: true, editable: true)
- c23349L20240412DraftLevel1Con_3 (type: esriFieldTypeString, alias: Catagory, SQL Type: sqlTypeOther, length: 255, nullable: true, editable: true)
- c23349L20240412DraftLevel1Con_4 (type: esriFieldTypeString, alias: Alighnment, SQL Type: sqlTypeOther, length: 255, nullable: true, editable: true)
- Shape__Length (type: esriFieldTypeDouble, alias: Shape__Length, SQL Type: sqlTypeDouble, nullable: true, editable: false)
Templates:
Name: 1,SH-53, Access Management: Develop and apply an access management plan compliant with state standards to reduce driveways and intersections on the highway. ,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: SH-53, Access Management: Develop and apply an access management plan compliant with state standards to reduce driveways and intersections on the highway.
- Alternative_Routes_Level: 1
- Screen_Rationale: Retained as Element
Name: 2,SH-53, Expanded Highway: Add travel lanes and improve intersections on SH-53 from state line to Rathdrum. ,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: SH-53, Expanded Highway: Add travel lanes and improve intersections on SH-53 from state line to Rathdrum.
- Alternative_Routes_Level: 2
- Screen_Rationale: Carried Forward
Name: 3,US-95, Expanded Highway: Add travel lanes and improve intersections through the study area. ,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: US-95, Expanded Highway: Add travel lanes and improve intersections through the study area.
- Alternative_Routes_Level: 3
- Screen_Rationale: Carried Forward
Name: 4,SH-41, Expanded Highway: Add travel lanes and improve intersections to SH-41 from I-90 to Lancaster Road. ,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: SH-41, Expanded Highway: Add travel lanes and improve intersections to SH-41 from I-90 to Lancaster Road.
- Alternative_Routes_Level: 4
- Screen_Rationale: Carried Forward
Name: 5,US-95, Elevated Byway: Build a structure in the existing median with local traffic on the existing ground level highway and regional through trips within express lanes on the structure above.,Eliminated: Considered unreasonable due to anticipated high cost and complexity of construction, operations, and maintenance for approximately 5.5 miles of grade-separated structures.
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: US-95, Elevated Byway: Build a structure in the existing median with local traffic on the existing ground level highway and regional through trips within express lanes on the structure above.
- Alternative_Routes_Level: 5
- Screen_Rationale: Eliminated: Considered unreasonable due to anticipated high cost and complexity of construction, operations, and maintenance for approximately 5.5 miles of grade-separated structures.
Name: 6,US-95, At-grade Express Lanes: Add express lanes to US-95,Eliminated: Would not meet Purpose and Need to address capacity constraints or add or improve a route for regional and local trips. Express lanes are not compatible with at-grade intersections in this context.
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: US-95, At-grade Express Lanes: Add express lanes to US-95
- Alternative_Routes_Level: 6
- Screen_Rationale: Eliminated: Would not meet Purpose and Need to address capacity constraints or add or improve a route for regional and local trips. Express lanes are not compatible with at-grade intersections in this context.
Name: 7,US-95, Parallel Express Lanes: Add separate express lanes parallel to US-95. ,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: US-95, Parallel Express Lanes: Add separate express lanes parallel to US-95.
- Alternative_Routes_Level: 7
- Screen_Rationale: Carried Forward
Name: 8,SH-53, Frontage Road: Add a frontage road on the north side paralleling SH-53. ,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: SH-53, Frontage Road: Add a frontage road on the north side paralleling SH-53.
- Alternative_Routes_Level: 8
- Screen_Rationale: Carried Forward
Name: 12,Prairie Avenue, Improved Arterial: Update to a two-lane arterial with a median/turn lane from Beck Road to McGuire Road; update to a four-lane arterial with a median/turn lane from McGuire Road to SH-41. ,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Prairie Avenue, Improved Arterial: Update to a two-lane arterial with a median/turn lane from Beck Road to McGuire Road; update to a four-lane arterial with a median/turn lane from McGuire Road to SH-41.
- Alternative_Routes_Level: 12
- Screen_Rationale: Retained as Element
Name: 13,16th Avenue, Extension: Extend 16th Avenue from Meyer Road to Huetter Road as a four-lane arterial with a median/turn lane.,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: 16th Avenue, Extension: Extend 16th Avenue from Meyer Road to Huetter Road as a four-lane arterial with a median/turn lane.
- Alternative_Routes_Level: 13
- Screen_Rationale: Retained as Element
Name: 14,Chase Road, Improved Arterial: Update to four-lane arterial from Seltice Way to SH-53.,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Chase Road, Improved Arterial: Update to four-lane arterial from Seltice Way to SH-53.
- Alternative_Routes_Level: 14
- Screen_Rationale: Retained as Element
Name: 15,Hayden Avenue, Improved Arterial: Update to four-lane arterial with a median/turn lane from SH-53 to US-95.,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Hayden Avenue, Improved Arterial: Update to four-lane arterial with a median/turn lane from SH-53 to US-95.
- Alternative_Routes_Level: 15
- Screen_Rationale: Retained as Element
Name: 16,Huetter Road, Improved Arterial 1: Update to four-lane arterial with a median/turn lane from Seltice Way to Lancaster Road.,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Huetter Road, Improved Arterial 1: Update to four-lane arterial with a median/turn lane from Seltice Way to Lancaster Road.
- Alternative_Routes_Level: 16
- Screen_Rationale: Carried Forward
Name: 17,Huetter Road, Extended Improved Arterial: New four-lane arterial with a median/turn lane from I-90 to US-95 from the I-90 rest area to Wyoming Avenue, then going northeast south of the UPRR to connect with US-95.,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Huetter Road, Extended Improved Arterial: New four-lane arterial with a median/turn lane from I-90 to US-95 from the I-90 rest area to Wyoming Avenue, then going northeast south of the UPRR to connect with US-95.
- Alternative_Routes_Level: 17
- Screen_Rationale: Carried Forward
Name: 18,Meyer Road, Improved Arterial: Update to four-lane arterial with a median/turn lane from Prairie Avenue to Wyoming Avenue.,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Meyer Road, Improved Arterial: Update to four-lane arterial with a median/turn lane from Prairie Avenue to Wyoming Avenue.
- Alternative_Routes_Level: 18
- Screen_Rationale: Retained as Element
Name: 19,Poleline/Hanley Avenue, Improved Arterial: Update to four-lane arterial with a median/turn lane from Greensferry Road to US-95. ,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Poleline/Hanley Avenue, Improved Arterial: Update to four-lane arterial with a median/turn lane from Greensferry Road to US-95.
- Alternative_Routes_Level: 19
- Screen_Rationale: Retained as Element
Name: 20,Lancaster Road, Improved Arterial: Update to four-lane arterial with a median/turn lane from Huetter Road to US-95.,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Lancaster Road, Improved Arterial: Update to four-lane arterial with a median/turn lane from Huetter Road to US-95.
- Alternative_Routes_Level: 20
- Screen_Rationale: Retained as Element
Name: 21,Beck Road, Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): I-90 to SH-53 with a new overpass over the BNSF line.,Eliminated: Considered unreasonable as this alignment would serve the same purpose as a Pleasant View Rd access-controlled corridor, and Pleasant View Road has more opportunity for improved east-west connectivity.
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Beck Road, Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): I-90 to SH-53 with a new overpass over the BNSF line.
- Alternative_Routes_Level: 21
- Screen_Rationale: Eliminated: Considered unreasonable as this alignment would serve the same purpose as a Pleasant View Rd access-controlled corridor, and Pleasant View Road has more opportunity for improved east-west connectivity.
Name: 22,Greensferry Road, Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): Update to grade-separated, access-controlled highway between I-90 and SH-53 with a new overpass over the BNSF line.,Eliminated: An access controlled highway would necessitate an interchange with I-90. Directly connecting to I-90 is infeasible due to close proximity (less than 1 mile) to adjacent interchanges. Note: Collector-distributor roads along I-90 are being studied separately, which could make this feasible; however, is outside of the scope of this study.
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Greensferry Road, Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): Update to grade-separated, access-controlled highway between I-90 and SH-53 with a new overpass over the BNSF line.
- Alternative_Routes_Level: 22
- Screen_Rationale: Eliminated: An access controlled highway would necessitate an interchange with I-90. Directly connecting to I-90 is infeasible due to close proximity (less than 1 mile) to adjacent interchanges. Note: Collector-distributor roads along I-90 are being studied separately, which could make this feasible; however, is outside of the scope of this study.
Name: 23,Pleasant View Road, Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): I-90 to SH-53.,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Pleasant View Road, Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): I-90 to SH-53.
- Alternative_Routes_Level: 23
- Screen_Rationale: Carried Forward
Name: 26,SH-41, Access Controlled Highway (with parallel frontage/backage road and interchanges at key crossroads): I-90 to Lancaster Road. ,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: SH-41, Access Controlled Highway (with parallel frontage/backage road and interchanges at key crossroads): I-90 to Lancaster Road.
- Alternative_Routes_Level: 26
- Screen_Rationale: Carried Forward
Name: 27,SH-53, Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): State line to Rathdrum.,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: SH-53, Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): State line to Rathdrum.
- Alternative_Routes_Level: 27
- Screen_Rationale: Carried Forward
Name: 28,Huetter Road (Alternate US-95 alignment), Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): Along existing Huetter Road from I-90 to Lancaster Road, then new alignment going northeast along UPRR and connect with US-95. ,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Huetter Road (Alternate US-95 alignment), Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): Along existing Huetter Road from I-90 to Lancaster Road, then new alignment going northeast along UPRR and connect with US-95.
- Alternative_Routes_Level: 28
- Screen_Rationale: Carried Forward
Name: 29,US-95, Access Controlled (with parallel frontage road and interchanges at key crossroads): Through the study area. ,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: US-95, Access Controlled (with parallel frontage road and interchanges at key crossroads): Through the study area.
- Alternative_Routes_Level: 29
- Screen_Rationale: Carried Forward
Name: 30,New Local Arterial: New arterial connection between Greensferry Road and Huetter Road midway between Hayden Avenue and Wyoming Avenue.,Eliminated: Would not meet Purpose and Need to address capacity constraints or add or improve a route for regional and local trips.
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: New Local Arterial: New arterial connection between Greensferry Road and Huetter Road midway between Hayden Avenue and Wyoming Avenue.
- Alternative_Routes_Level: 30
- Screen_Rationale: Eliminated: Would not meet Purpose and Need to address capacity constraints or add or improve a route for regional and local trips.
Name: 31,Pleasant View Road to Lancaster/Heutter Road along UPRR Access Controlled Highway: Parallel to the UPRR line from Pleasant View Road to Lancaster Road. Note: North or south of UPRR line. Not feasible within UPRR right-of-way.,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Pleasant View Road to Lancaster/Heutter Road along UPRR Access Controlled Highway: Parallel to the UPRR line from Pleasant View Road to Lancaster Road. Note: North or south of UPRR line. Not feasible within UPRR right-of-way.
- Alternative_Routes_Level: 31
- Screen_Rationale: Carried Forward
Name: 32,Pleasant View Road to SH-41 along UPRR Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): Parallel to the UPRR line from Pleasant View to SH-41. Note: North or south of UPRR line. Not feasible within UPRR right-of-way.,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Pleasant View Road to SH-41 along UPRR Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): Parallel to the UPRR line from Pleasant View to SH-41. Note: North or south of UPRR line. Not feasible within UPRR right-of-way.
- Alternative_Routes_Level: 32
- Screen_Rationale: Carried Forward
Name: 33,SH-41 to US-95 along UPRR Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): Parallel to the UPRR line from SH-41 to the northeast and connect to US-95. Note: North or south of UPRR line. Not feasible within UPRR right-of-way.,Eliminated: The alignment following parallel to the UPRR line to the SH-53/US-95 single-point interchange is unreasonable as this would require the construction of an interchange complex linking three major roadways above the UPRR line. The alignment could reasonably connect to US-95 one mile south of existing US-95 and SH-53 interchange, similar to other alignments carried forward.
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: SH-41 to US-95 along UPRR Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): Parallel to the UPRR line from SH-41 to the northeast and connect to US-95. Note: North or south of UPRR line. Not feasible within UPRR right-of-way.
- Alternative_Routes_Level: 33
- Screen_Rationale: Eliminated: The alignment following parallel to the UPRR line to the SH-53/US-95 single-point interchange is unreasonable as this would require the construction of an interchange complex linking three major roadways above the UPRR line. The alignment could reasonably connect to US-95 one mile south of existing US-95 and SH-53 interchange, similar to other alignments carried forward.
Name: 34,Stateline to Huetter Road along UPRR Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): Parallel to the UPRR line from state line to the Huetter Road. Note: North or south of UPRR line. Not feasible within UPRR right-of-way.,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Stateline to Huetter Road along UPRR Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): Parallel to the UPRR line from state line to the Huetter Road. Note: North or south of UPRR line. Not feasible within UPRR right-of-way.
- Alternative_Routes_Level: 34
- Screen_Rationale: Carried Forward
Name: 35,Meyer Road, Extension: Extend Meyer Road from SH-53 over BNSF and connect to SH-41. ,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Meyer Road, Extension: Extend Meyer Road from SH-53 over BNSF and connect to SH-41.
- Alternative_Routes_Level: 35
- Screen_Rationale: Retained as Element
Name: 36,Chase Road, SH-53 Connection: Extend Chase Road over BNSF and connect to SH-53. ,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Chase Road, SH-53 Connection: Extend Chase Road over BNSF and connect to SH-53.
- Alternative_Routes_Level: 36
- Screen_Rationale: Retained as Element
Name: 37,Idaho Road, SH-53 Connection: Extend Idaho Road over BNSF and connect to SH-53.,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Idaho Road, SH-53 Connection: Extend Idaho Road over BNSF and connect to SH-53.
- Alternative_Routes_Level: 37
- Screen_Rationale: Retained as Element
Name: 38,Lancaster Road, SH-53 Connection: Extend Lancaster Road over BNSF and connect to SH-53. ,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Lancaster Road, SH-53 Connection: Extend Lancaster Road over BNSF and connect to SH-53.
- Alternative_Routes_Level: 38
- Screen_Rationale: Retained as Element
Name: 39,Mullen Avenue, Extension: Extend Mullen Avenue from programmed project at Huetter Road to Kathleen Avenue. ,Eliminated :Considered unreasonable due to alignment bisecting U.S. Forest Service Nursery property
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Mullen Avenue, Extension: Extend Mullen Avenue from programmed project at Huetter Road to Kathleen Avenue.
- Alternative_Routes_Level: 39
- Screen_Rationale: Eliminated :Considered unreasonable due to alignment bisecting U.S. Forest Service Nursery property.
Name: 40,Continue Huetter Road south over the Spokane River on and new bridge then in a tunnel to connect to US-95.,Eliminated: Not within the scope of this study.
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Continue Huetter Road south over the Spokane River on and new bridge then in a tunnel to connect to US-95.
- Alternative_Routes_Level: 40
- Screen_Rationale: Eliminated: Not within the scope of this study.
Name: 41,SH-41, Access Controlled Highway (with parallel frontage road & interchanges at key crossroads) from I-90 to US-95: SH-41 from I-90 to a new alignment south of UPRR line connecting to US-95. ,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: SH-41, Access Controlled Highway (with parallel frontage road & interchanges at key crossroads) from I-90 to US-95: SH-41 from I-90 to a new alignment south of UPRR line connecting to US-95.
- Alternative_Routes_Level: 41
- Screen_Rationale: Carried Forward
Name: 42,Parallel to Greensferry Road, New Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): Parallel to Greensferry Road from I-90 to a new alignment south of UPRR connecting to US-95. ,Eliminated: An access controlled highway would necessitate an interchange with I-90. Directly connecting to I-90 is infeasible due to close proximity (less than 1 mile) to adjacent interchanges. Note: Collector-distributor roads and other infrastructure along I-90 are being studied separately, which could make this feasible; however, is outside of the scope of this study.
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Parallel to Greensferry Road, New Access Controlled Highway (with parallel frontage road & interchanges at key crossroads): Parallel to Greensferry Road from I-90 to a new alignment south of UPRR connecting to US-95.
- Alternative_Routes_Level: 42
- Screen_Rationale: Eliminated: An access controlled highway would necessitate an interchange with I-90. Directly connecting to I-90 is infeasible due to close proximity (less than 1 mile) to adjacent interchanges. Note: Collector-distributor roads and other infrastructure along I-90 are being studied separately, which could make this feasible; however, is outside of the scope of this study.
Name: 43,New North-South Rathdrum Arterial: New arterial between Meyer Road/Boekel Road and Greensferry Road/Lancaster Road.,Eliminated: Considered unreasonable due to alignment being located entirely within utilities corridor. Anticipated high-level of impacts to utilities corridor.
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: New North-South Rathdrum Arterial: New arterial between Meyer Road/Boekel Road and Greensferry Road/Lancaster Road.
- Alternative_Routes_Level: 43
- Screen_Rationale: Eliminated: Considered unreasonable due to alignment being located entirely within utilities corridor. Anticipated high-level of impacts to utilities corridor.
Name: 44,New North-South Access Controlled Highway on west side of study area: I-90 to SH-53 between Beck Road and Pleasant View Road, connect to Pleasant View Road/I-90 Interchange. ,Eliminated: Considered unreasonable as this alignment would serve the same purpose as a Pleasant View Rd access-controlled corridor, and Pleasant View has an existing alignment and right-of-way, and established connection to I-90.
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: New North-South Access Controlled Highway on west side of study area: I-90 to SH-53 between Beck Road and Pleasant View Road, connect to Pleasant View Road/I-90 Interchange.
- Alternative_Routes_Level: 44
- Screen_Rationale: Eliminated: Considered unreasonable as this alignment would serve the same purpose as a Pleasant View Rd access-controlled corridor, and Pleasant View has an existing alignment and right-of-way, and established connection to I-90.
Name: 45,SH-41, North Realignment: Realign SH-41 to the west north of Wyoming Avenue to align with Greensferry Road with a new overpass over the BNSF line. ,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: SH-41, North Realignment: Realign SH-41 to the west north of Wyoming Avenue to align with Greensferry Road with a new overpass over the BNSF line.
- Alternative_Routes_Level: 45
- Screen_Rationale: Carried Forward
Name: 46,New East-West Access Controlled Highway south of Rathdrum to US-95 via Lancaster Road: From SH-53 and Pleasant View Road, parallel to BNSF line to Lancaster Road, and parallel to UPRR line to connect with US-95. ,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: New East-West Access Controlled Highway south of Rathdrum to US-95 via Lancaster Road: From SH-53 and Pleasant View Road, parallel to BNSF line to Lancaster Road, and parallel to UPRR line to connect with US-95.
- Alternative_Routes_Level: 46
- Screen_Rationale: Carried Forward
Name: 47,New East-West Access Controlled Highway south of Rathdrum to from Pleasant View Road and SH -53 to US-95 via Wyoming and parallel to UPRR line: From SH-53 and Pleasant View Road to Wyoming Avenue, and parallel to UPRR line to connect with US-95. ,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: New East-West Access Controlled Highway south of Rathdrum to from Pleasant View Road and SH -53 to US-95 via Wyoming and parallel to UPRR line: From SH-53 and Pleasant View Road to Wyoming Avenue, and parallel to UPRR line to connect with US-95.
- Alternative_Routes_Level: 47
- Screen_Rationale: Carried Forward
Name: 48,New East-West corridor from Pleasant View Road to US-95 via new alignment from Pleasant View Road to Hayden Avenue and parallel to UPRR line.,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: New East-West corridor from Pleasant View Road to US-95 via new alignment from Pleasant View Road to Hayden Avenue and parallel to UPRR line.
- Alternative_Routes_Level: 48
- Screen_Rationale: Carried Forward
Name: 49,New North-South Access Controlled Highway along Meyer Road: Realign SH-41 and SH-53 north of Rathdrum with direct connection to Meyer Road over the BNSF line.,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: New North-South Access Controlled Highway along Meyer Road: Realign SH-41 and SH-53 north of Rathdrum with direct connection to Meyer Road over the BNSF line.
- Alternative_Routes_Level: 49
- Screen_Rationale: Retained as Element
Name: 50,New East-West Access Controlled Highway north of Rathdrum: Realign SH-53 north of the City of Rathdrum from Greensferry Road to connect with SH-41.,Carried Forward
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: New East-West Access Controlled Highway north of Rathdrum: Realign SH-53 north of the City of Rathdrum from Greensferry Road to connect with SH-41.
- Alternative_Routes_Level: 50
- Screen_Rationale: Carried Forward
Name: 51,Hayden Avenue, Pathway: Add pathway along Hayden from Huetter Road to Government Way.,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Hayden Avenue, Pathway: Add pathway along Hayden from Huetter Road to Government Way.
- Alternative_Routes_Level: 51
- Screen_Rationale: Retained as Element
Name: 52,Prairie Trail, Trail Extension: Extend Prairie Trail through old railroad line from Meyer Road to SH-41. ,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Prairie Trail, Trail Extension: Extend Prairie Trail through old railroad line from Meyer Road to SH-41.
- Alternative_Routes_Level: 52
- Screen_Rationale: Retained as Element
Name: 53,Huetter Road, Bicycle and Pedestrian Improvements: Add pedestrian access along Huetter Road from Seltice Way to new trail along the rail corridor and to Centennial Trail.,Retained as Element
Description:
Drawing Tool: esriFeatureEditToolLine
Prototype:
Attributes:
- Concept_Description: Huetter Road, Bicycle and Pedestrian Improvements: Add pedestrian access along Huetter Road from Seltice Way to new trail along the rail corridor and to Centennial Trail.
- Alternative_Routes_Level: 53
- Screen_Rationale: Retained as Element
Is Data Versioned: false
Has Contingent Values: false
Supports Rollback On Failure Parameter: true
Last Edit Date: 6/20/2024 5:10:39 PM
Schema Last Edit Date: 6/20/2024 5:10:39 PM
Data Last Edit Date: 6/20/2024 5:10:39 PM
Supported Operations:
Query
Query Pivot
Query Top Features
Query Analytic
Query Bins
Generate Renderer
Validate SQL
Get Estimates
ConvertFormat