ArcGIS REST Services Directory

GetEstimates: LWR_InteractiveMap_SchemeDesignConsultation_01

Layer Estimates:

Layer: Proposed permanent realigned PRoW or cycle route (ID:45)
Count: 2
Extent:


Layer: Indicative alignment of the logistics tunnel (ID:36)
Count: 7
Extent:


Layer: Indicative alignment of the recycled water conveyance tunnel (internal diameter 3.5m) (ID:29)
Count: 7
Extent:


Layer: Indicative alignment of the below-ground intake connection (ID:34)
Count: 7
Extent:


Layer: Indicative alignment of the below-ground outfall connection (ID:35)
Count: 7
Extent:


Layer: Indicative alignment of the below-ground adit tunnel (Option 1) (ID:33)
Count: 7
Extent:


Layer: Indicative alignment of the raw water conveyance pipeline (Option 2) (ID:38)
Count: 7
Extent:


Layer: Indicative alignment of the return pipeline (ID:37)
Count: 7
Extent:


Layer: Recycled water conveyance tunnel corridor (ID:30)
Count: 2
Extent:


Layer: Thames Lee Tunnel (TLT) connection at Tudor Drive corridor (Option 2) (ID:39)
Count: 2
Extent:


Layer: Area for potential temporary highway works (ID:28)
Count: 8
Extent:


Layer: Mogden STW site - land in ownership of Thames Water (ID:27)
Count: 1
Extent:


Layer: Temporary above ground construction area (ID:26)
Count: 13
Extent:


Layer: Walking and cycling path realignment (ID:451)
Count: 29
Extent:


Layer: Tertiary Treatment Plant and ancillary equipment (ID:44)
Count: 29
Extent:


Layer: Intake (ID:42)
Count: 29
Extent:


Layer: Kiosk housing control equipment (ID:43)
Count: 29
Extent:


Layer: Access hatches (ID:0)
Count: 11
Extent:


Layer: Access hatches (ID:22)
Count: 29
Extent:


Layer: Bankside outfall (Option A) (ID:40)
Count: 29
Extent:


Layer: Near bankside in-river outfall (Option B) (ID:23)
Count: 1
Extent: