Name: DM_Phase_Line
Display Field:
Type: Feature Layer
Geometry Type: esriGeometryPolyline
Description:
Copyright Text:
Min. Scale: 1155582
Max. Scale: 0
Default Visibility: true
Max Record Count: 2000
Supported query Formats: JSON, geoJSON, PBF
Use Standardized Queries: True
Extent:
XMin: -10424527.7282336
YMin: 5094135.8860807
XMax: -10410054.3021104
YMax: 5100749.61243756
Spatial Reference: 102100 (3857)
Drawing Info:
{"renderer":{"type":"uniqueValue","field1":"Proposed_Phasing","uniqueValueInfos":[{"value":"Phase A: 2020 - 2021 (CONSTRUCTION COMPLETED)","label":"Phase A: 2020 - 2021 (CONSTRUCTION COMPLETED)","symbol":{"color":[237,81,81,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}},{"value":"Phase B: 2022 - 2023 (100% DESIGN, BID DATE FEBRUARY 2022)","label":"Phase B: 2022 - 2023 (100% DESIGN, BID DATE FEBRUARY 2022)","symbol":{"color":[20,158,206,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}},{"value":"Phase C: 2023 - 2025 (100% DESIGN, BID DATE FEBRUARY 2022)","label":"Phase C: 2023 - 2025 (100% DESIGN, BID DATE FEBRUARY 2022)","symbol":{"color":[167,198,54,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}},{"value":"Phase D: 2024 - 2026 (30% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)","label":"Phase D: 2024 - 2026 (30% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)","symbol":{"color":[158,85,156,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}},{"value":"Phase E: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)","label":"Phase E: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)","symbol":{"color":[252,146,31,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}},{"value":"Phase F: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)","label":"Phase F: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)","symbol":{"color":[255,222,62,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}},{"value":"Phase G: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)","label":"Phase G: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)","symbol":{"color":[247,137,216,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}},{"value":"Phase H: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)","label":"Phase H: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)","symbol":{"color":[183,129,74,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}}]},"transparency":0}
HasZ: false
HasM: false
Has Attachments: false
Has Geometry Properties: true
HTML Popup Type: esriServerHTMLPopupTypeNone
Object ID Field: OBJECTID
Unique ID Field:
IsSystemMaintained : True
Global ID Field: GlobalID
Type ID Field: Proposed_Phasing
Fields:
- OBJECTID (type: esriFieldTypeOID, alias: OBJECTID, SQL Type: sqlTypeOther, length: 0, nullable: false, editable: false)
- Proposed_Phasing (type: esriFieldTypeString, alias: Proposed_Phasing, SQL Type: sqlTypeOther, length: 255, nullable: true, editable: true)
- SHAPE__Length (type: esriFieldTypeDouble, alias: SHAPE__Length, SQL Type: sqlTypeDouble, nullable: true, editable: false)
- GlobalID (type: esriFieldTypeGlobalID, alias: GlobalID, SQL Type: sqlTypeOther, length: 38, nullable: false, editable: false)
- CreationDate (type: esriFieldTypeDate, alias: CreationDate, SQL Type: sqlTypeOther, length: 8, nullable: true, editable: false)
- Creator (type: esriFieldTypeString, alias: Creator, SQL Type: sqlTypeOther, length: 128, nullable: true, editable: false)
- EditDate (type: esriFieldTypeDate, alias: EditDate, SQL Type: sqlTypeOther, length: 8, nullable: true, editable: false)
- Editor (type: esriFieldTypeString, alias: Editor, SQL Type: sqlTypeOther, length: 128, nullable: true, editable: false)
Types:
ID: Phase A: 2020 - 2021 (CONSTRUCTION COMPLETED)
Name: Phase A: 2020 - 2021 (CONSTRUCTION COMPLETED)
Domains:
Templates:
Name: Phase A: 2020 - 2021 (CONSTRUCTION COMPLETED)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
- Proposed_Phasing: Phase A: 2020 - 2021 (CONSTRUCTION COMPLETED)
ID: Phase B: 2022 - 2023 (100% DESIGN, BID DATE FEBRUARY 2022)
Name: Phase B: 2022 - 2023 (100% DESIGN, BID DATE FEBRUARY 2022)
Domains:
Templates:
Name: Phase B: 2022 - 2023 (100% DESIGN, BID DATE FEBRUARY 2022)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
- Proposed_Phasing: Phase B: 2022 - 2023 (100% DESIGN, BID DATE FEBRUARY 2022)
ID: Phase C: 2023 - 2025 (100% DESIGN, BID DATE FEBRUARY 2022)
Name: Phase C: 2023 - 2025 (100% DESIGN, BID DATE FEBRUARY 2022)
Domains:
Templates:
Name: Phase C: 2023 - 2025 (100% DESIGN, BID DATE FEBRUARY 2022)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
- Proposed_Phasing: Phase C: 2023 - 2025 (100% DESIGN, BID DATE FEBRUARY 2022)
ID: Phase D: 2024 - 2026 (30% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
Name: Phase D: 2024 - 2026 (30% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
Domains:
Templates:
Name: Phase D: 2024 - 2026 (30% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
- Proposed_Phasing: Phase D: 2024 - 2026 (30% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
ID: Phase E: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
Name: Phase E: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
Domains:
Templates:
Name: Phase E: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
- Proposed_Phasing: Phase E: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
ID: Phase F: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Name: Phase F: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Domains:
Templates:
Name: Phase F: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
- Proposed_Phasing: Phase F: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
ID: Phase G: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Name: Phase G: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Domains:
Templates:
Name: Phase G: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
- Proposed_Phasing: Phase G: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
ID: Phase H: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Name: Phase H: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Domains:
Templates:
Name: Phase H: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
- Proposed_Phasing: Phase H: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Is Data Versioned: false
Has Contingent Values: false
Supports Rollback On Failure Parameter: true
Last Edit Date: 10/25/2024 8:12:38 PM
Schema Last Edit Date: 10/25/2024 8:12:38 PM
Data Last Edit Date: 10/25/2024 8:12:38 PM
Supported Operations:
Query
Query Pivot
Query Top Features
Query Analytic
Query Bins
Add Features
Update Features
Delete Features
Apply Edits
Calculate
Generate Renderer
Validate SQL
Get Estimates
ConvertFormat