ArcGIS REST Services Directory
Home
>
services
>
DM_Phase_Schedule (FeatureServer)
>
All Layers and Tables
|
API Reference
JSON
All Layers and Tables (DM_Phase_Schedule)
Layers:
Layer:
DM_Phase_Line
(0)
Name:
DM_Phase_Line
Display Field:
Type:
Feature Layer
Geometry Type:
esriGeometryPolyline
Description:
Copyright Text:
Min. Scale:
1155582
Max. Scale:
0
Default Visibility:
true
Max Record Count:
2000
Supported query Formats:
JSON, geoJSON, PBF
Use Standardized Queries:
True
Extent:
XMin: -10424527.7282336
YMin: 5094135.8860807
XMax: -10410054.3021104
YMax: 5100749.61243756
Spatial Reference: 102100 (3857)
Drawing Info:
{"renderer":{"type":"uniqueValue","field1":"Proposed_Phasing","uniqueValueInfos":[{"value":"Phase A: 2020 - 2021 (CONSTRUCTION COMPLETED)","label":"Phase A: 2020 - 2021 (CONSTRUCTION COMPLETED)","symbol":{"color":[237,81,81,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}},{"value":"Phase B: 2022 - 2023 (100% DESIGN, BID DATE FEBRUARY 2022)","label":"Phase B: 2022 - 2023 (100% DESIGN, BID DATE FEBRUARY 2022)","symbol":{"color":[20,158,206,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}},{"value":"Phase C: 2023 - 2025 (100% DESIGN, BID DATE FEBRUARY 2022)","label":"Phase C: 2023 - 2025 (100% DESIGN, BID DATE FEBRUARY 2022)","symbol":{"color":[167,198,54,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}},{"value":"Phase D: 2024 - 2026 (30% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)","label":"Phase D: 2024 - 2026 (30% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)","symbol":{"color":[158,85,156,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}},{"value":"Phase E: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)","label":"Phase E: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)","symbol":{"color":[252,146,31,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}},{"value":"Phase F: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)","label":"Phase F: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)","symbol":{"color":[255,222,62,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}},{"value":"Phase G: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)","label":"Phase G: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)","symbol":{"color":[247,137,216,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}},{"value":"Phase H: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)","label":"Phase H: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)","symbol":{"color":[183,129,74,255],"width":1.5,"type":"esriSLS","style":"esriSLSSolid"}}]},"transparency":0}
HasZ:
false
HasM:
false
Has Attachments:
false
Has Geometry Properties:
true
HTML Popup Type:
esriServerHTMLPopupTypeNone
Object ID Field:
OBJECTID
Unique ID Field:
Name : OBJECTID
IsSystemMaintained : True
Global ID Field:
GlobalID
Type ID Field:
Proposed_Phasing
Fields:
OBJECTID
(type: esriFieldTypeOID, alias: OBJECTID, SQL Type: sqlTypeOther, length: 0, nullable: false, editable: false)
Proposed_Phasing
(type: esriFieldTypeString, alias: Proposed_Phasing, SQL Type: sqlTypeOther, length: 255, nullable: true, editable: true)
SHAPE__Length
(type: esriFieldTypeDouble, alias: SHAPE__Length, SQL Type: sqlTypeDouble, nullable: true, editable: false)
GlobalID
(type: esriFieldTypeGlobalID, alias: GlobalID, SQL Type: sqlTypeOther, length: 38, nullable: false, editable: false)
CreationDate
(type: esriFieldTypeDate, alias: CreationDate, SQL Type: sqlTypeOther, length: 8, nullable: true, editable: false)
Creator
(type: esriFieldTypeString, alias: Creator, SQL Type: sqlTypeOther, length: 128, nullable: true, editable: false)
EditDate
(type: esriFieldTypeDate, alias: EditDate, SQL Type: sqlTypeOther, length: 8, nullable: true, editable: false)
Editor
(type: esriFieldTypeString, alias: Editor, SQL Type: sqlTypeOther, length: 128, nullable: true, editable: false)
Types:
ID: Phase A: 2020 - 2021 (CONSTRUCTION COMPLETED)
Name: Phase A: 2020 - 2021 (CONSTRUCTION COMPLETED)
Domains:
Templates:
Name: Phase A: 2020 - 2021 (CONSTRUCTION COMPLETED)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
Proposed_Phasing
: Phase A: 2020 - 2021 (CONSTRUCTION COMPLETED)
ID: Phase B: 2022 - 2023 (100% DESIGN, BID DATE FEBRUARY 2022)
Name: Phase B: 2022 - 2023 (100% DESIGN, BID DATE FEBRUARY 2022)
Domains:
Templates:
Name: Phase B: 2022 - 2023 (100% DESIGN, BID DATE FEBRUARY 2022)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
Proposed_Phasing
: Phase B: 2022 - 2023 (100% DESIGN, BID DATE FEBRUARY 2022)
ID: Phase C: 2023 - 2025 (100% DESIGN, BID DATE FEBRUARY 2022)
Name: Phase C: 2023 - 2025 (100% DESIGN, BID DATE FEBRUARY 2022)
Domains:
Templates:
Name: Phase C: 2023 - 2025 (100% DESIGN, BID DATE FEBRUARY 2022)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
Proposed_Phasing
: Phase C: 2023 - 2025 (100% DESIGN, BID DATE FEBRUARY 2022)
ID: Phase D: 2024 - 2026 (30% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
Name: Phase D: 2024 - 2026 (30% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
Domains:
Templates:
Name: Phase D: 2024 - 2026 (30% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
Proposed_Phasing
: Phase D: 2024 - 2026 (30% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
ID: Phase E: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
Name: Phase E: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
Domains:
Templates:
Name: Phase E: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
Proposed_Phasing
: Phase E: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - BARR ENGINEERING)
ID: Phase F: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Name: Phase F: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Domains:
Templates:
Name: Phase F: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
Proposed_Phasing
: Phase F: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
ID: Phase G: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Name: Phase G: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Domains:
Templates:
Name: Phase G: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
Proposed_Phasing
: Phase G: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
ID: Phase H: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Name: Phase H: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Domains:
Templates:
Name: Phase H: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Description:
Drawing Tool: esriFeatureEditToolNone
Prototype:
Attributes:
Proposed_Phasing
: Phase H: 2025 - 2028 (10% DESIGN, DESIGN CONSULTANT - STANTEC CONSULTING)
Is Data Versioned:
false
Has Contingent Values:
false
Supports Rollback On Failure Parameter:
true
Last Edit Date:
10/25/2024 8:12:38 PM
Schema Last Edit Date:
10/25/2024 8:12:38 PM
Data Last Edit Date:
10/25/2024 8:12:38 PM