ArcGIS REST Services Directory
JSON

Layer: SWP O&M Field Divisions (ID:0)

View In:   Map Viewer

Name: SWP O&M Field Divisions

Display Field: AssetRegister_Object

Type: Feature Layer

Geometry Type: esriGeometryPolyline

Description:

This is a line dataset of linear State Water Project assets, such as canals, pipelines, check structures, penstocks, siphons, tunnels, reservoirs, power plants, and pumping plants as defined in O&M's SWP Asset Register. The linear features were digitized from a combination of atlas dataset i17_StateWaterProject_Centerline, NAIP 2022 aerial photography and georeferenced design drawings. Each feature has been assigned an SWP Asset Register Object ID, Functional Location, Asset Description, Asset Level, and Asset Type. The Object ID serves as a unique identifier. The Asset Register is a hierarchical system and assets of a higher level will often overlap with "child" assets of a lower level. For example, pool assets overlap with different canal or pipeline assets because pools are Level 4 and canals and pipelines are Level 5.

This dataset has relationship classes with four other tables:

i17_StateWaterProject_BlueBook_Table1_Conveyance_Lines

i17_StateWaterProject_BlueBook_Table2_Pools

i17_StateWaterProject_BlueBook_Table3_Plants

i17_StateWaterProject_BlueBook_Table4_Reservoirs

These tables are digital versions of SWP Blue Book tables 1-4 and are related through the Asset Register Object ID field. The tables contain additional information on conveyance lines, pools, power and pumping plants, and reservoirs that come specifically from the Blue Book.

The ultimate goal is for this dataset to contain all the linear features in the SWP and in the Asset Register. However, there are several assets that are known to be missing and these will be addressed in updates over time. Missing assets are as follows:

Peace Valley Pipeline Inlet, Castaic PP Penstocks, Castaic Lake Penstocks, Yucaipa Pipeline, Mentone South Pipeline, Mentone East Pipeline, Tehachapi Tunnel 2 Transition, Santa Ana Pipeline Transition, Polonio Pass Treatment Plant Valve, Pool W4, Tank Site 5 Terminus (2 Tanks) [Coastal Branch], Canal between entering into Thermalito Afterbay, Gorman Creek Siphon, Hungry Valley Siphon 2A, Hungry Valley Siphon 2B, Side Hill Siphon, CHPS Forebay, Crafton Hills Reservoir Outlet Works, Crafton Hills Reservoir Inlet Works

In addition, the location of the Grizzly Valley Pipeline is uncertain and only an approximate centerline is provided.

This dataset is current as of 3/20/2024.



Copyright Text: Division of Engineering, Geomatics Branch; Division of Operations and Maintenance

Min. Scale: 0

Max. Scale: 0

Default Visibility: true

Max Record Count: 2000

Supported query Formats: JSON, geoJSON, PBF

Use Standardized Queries: True

Extent:

Drawing Info:

HasZ: true

HasM: false

Has Attachments: false

Has Geometry Properties: true

HTML Popup Type: esriServerHTMLPopupTypeAsHTMLText

Object ID Field: OBJECTID

Unique ID Field:

Global ID Field:

Type ID Field: AssetRegister_Description

Fields:
Types:

Is Data Versioned: false

Has Contingent Values: false

Supports Rollback On Failure Parameter: true

Last Edit Date: 5/30/2024 8:16:21 PM

Schema Last Edit Date: 5/30/2024 8:16:21 PM

Data Last Edit Date: 5/30/2024 8:16:21 PM

Supported Operations:   Query   Query Pivot   Query Top Features   Query Analytic   Query Bins   Generate Renderer   Validate SQL   Get Estimates   ConvertFormat